Energy
The DLT Subsea Drill Platform
Heavy-lift load-out of subsea drill platform components.
Components were lifted onto the designated transport vessel using specialised gear including spreader beams and heavy-duty slings for load stability.
Operations ran under strict safety protocols with real-time monitoring. Ballasting and securing procedures maintained vessel stability for onward transport.
The project met timelines through close coordination between lifting teams, port authorities and logistics specialists.