Projects
Case studies from the field
From offshore wind load-outs to constrained factory installs — selected Croft delivery highlights.
Enus Maintenance Shutdown Program
Scheduled six-month maintenance — Re-Boiler vessel penny ends.
Industrial →
The Cable Enterprise Remob
Cable-laying vessel demobilisation at AV Dawson Port, Middlesbrough.
Marine →
Cheetah Crane Installation
Internal crane install in a major European battery manufacturing facility.
Manufacturing →
Whitley Bay High School Deconstruction
Controlled deconstruction lifting on an educational site.
Demolition →
The DLT Subsea Drill Platform
Heavy-lift load-out of subsea drill platform components.
Energy →
Triton Knoll Offshore Wind Farm
Pre-assembly load-out supporting 90 × Vestas V164-9.5 MW turbines.
Renewables →